Silverdale High School
The extension to Silverdale High School provides a sixth form building designed to match the existing buildings on site and increase student capacity by 366. The green roof system aims to capture rainfall and re-use excess water in a sustainable approach.
Phoenix Flooring were pleased to be appointed to undertake the flooring on the project and have a long-standing working relationship with Portakabin.
