Calverley Building Refurbishment
Leeds Metropolitan University, City Campus
Leeds LS1 3HE
Refurbishing a 10 storey, 50 year old building whilst still a live teaching environment provided significant headaches to the main contractor. Fortunately by using muffling equipment, the students remained undisturbed and users of the building suffered minimal disruption.
Harnessing three floors at a time, the phased renovation encompassed window replacement, cleaning of the concrete facade, redecoration and replacing of floor finishes, which Phoenix Flooring & Tiling were pleased to undertake.
The striking internal colour scheme incorporates purple, lime green and orange to provide a modern look and feel to the concrete 1970’s style building – a significant contrast externally to internally.